Previous Landfill CQA Project Details
1) Provided CQA Supervision for Development and Construction of Cell 10 at Barling Landfill Site Essex, working with clay mineral
liner materials.
Client: Faber Maunsell Ltd. - Essex
Contact: Seera Chara - Senior Geotechnical Engineer
Site Operator: Cory Environmental Ltd
2) Provided CQA Supervision for Capping with LLDPE flexible membrane liner (FML) and geotextile, followed by the placement of
restoration soils at
Mucking Landfill Site, Essex.
Client: Faber Maunsell Ltd. - Essex
Contact: Seera Chara - Senior Geotechnical Engineer
Site Operator: Cory Environmental Ltd
3) Recommendation of improvements and supervision of improvement works to existing leachate and gas management systems.
Client: Enitial Projects Ltd. - Staffordshire
Contact: Richard Evans – Environmental Director
Site Operator/Site: Cleansing Services Group – Poundbottom Landfill Site – Wiltshire -England
4) CQA Engineer for the capping and restoration of Phase II, an 18,000 m2 area with LLDPE FML and protection Geo-composite
blanket, followed by the placement of 18,000 cubic metres of restoration soils and the installation of a surface water drainage
system.
Client: White, Young & Green Ltd. – Peterborough
Contact: Diane Sutherland – Senior Consultant
Site Operator/Site: Waste Recycling Group – Judkins Landfill Site – Warwickshire -England
5) CQA Engineer overseeing the capping and restoration of Stage 3 restoration works. Comprising of the placement of 10,000 m2 of clay
cap, overlaid with Pozidrain geotextile, placement of 10,000 m2 of subsoil, erosion matting and the placement topsoils. Works also
included the installation of a surface water drainage system incorporating existing gas and leachate management systems.
Client: Enviros Consulting Ltd.
Contact: Steve Last – Technical Director
Site Operator/Site: Wexford County Council – Killurin Landfill Site – County Wexford - Ireland
Assisted with the production of the final CQA Validation and Certification Report.
|